---
title: "Electronic working-time record for construction companies · Sicheca"
description: "How to keep the electronic working-time record in a construction company: shifts, overtime, fines and the simplest way to record."
url: https://sicheca.com/en/blog/registro-de-jornada-para-constructoras
lang: en
alternate_es: https://sicheca.com/blog/registro-de-jornada-para-constructoras.md
---
By industry · 5 min read

# Electronic working-time record for construction companies

Short answer

A construction company can comply with the electronic working-time record from each person's phone, with the location confirmed only at the moment of recording. The law asks for recording each person's start and end times; it does not ask for a wall-mounted time clock.

## How work is done at a construction company

A construction company employs bricklayers, skilled workers, site supervisors and administrative staff, with site workdays from Monday to Saturday, in locations that change. That brings three challenges for measuring working time:

- Each job lasts a few months and then moves to a new place.
- Site staff come and go in stages.
- Paper pay sheets get lost.

## What the law asks of construction companies

Since the 2026 reform, the Federal Labor Law requires recording electronically the start and end time of each worker's workday (article 132, section XXXIV). Failing to do so is fined 250 to 5,000 UMA. The STPS will define who it applies to and what exceptions there will be. The details are in [the reform guide](https://sicheca.com/en/reforma-laboral-2027).

**Work peaks.** Overtime has a weekly cap: 9 hours at double time in 2027, with a maximum of 4 per day on no more than 4 days, and never more than 12 total hours in a day.

**Hourly or temporary staff.** They have the same working-hour limits and must also be recorded.

**Work outside the premises.** The time a person is at the company's disposal is working time, even if they are not at your facilities.

## How to record working time at a construction company

1. Register your team and their shifts.
2. Each person clocks in from their phone where their shift begins.
3. The location is captured only when clocking in; there is no tracking during the day.
4. You see in one place who has already started, who is missing and where they clocked in.

**Example.** Each job site is added as a location. When it ends, it is closed and the staff move to the next one without installing anything.

## Calculate your overtime

## How to do the math by hand

Take a salary of $400 per day on a day shift. The ordinary hour is worth 400 ÷ 8 = $50. In 2027, with 11 overtime hours in the week, the first 9 are paid at double time (9 × $100 = $900) and the remaining 2 at triple time (2 × $150 = $300). Total: $1,200.

## Common mistakes at a construction company

- Keeping attendance from memory or in a notebook.
- Recording the clock-in and forgetting the clock-out.
- Covering peaks only with overtime, until exceeding the weekly cap.
- Not recording temporary staff because they only come in for one day.
- Asking staff who work offsite to stop by the office just to clock in.

## What to check every day and every week

**Every day.**

- Who did not record their clock-in or clock-out.
- Records made in unexpected places.
- Departures later than planned.

**Every week.**

- Each person's overtime against the weekly cap.
- Days when someone came close to 12 hours.
- Rest days that were actually taken.

## How much an overtime hour costs: example in pesos

Suppose a daily wage of $450 on a day shift. The ordinary hourly rate is $56.25. One overtime hour at double time costs $112.50 and one at triple time, $168.75. If a person works 9 overtime hours in a week in 2027, that is $1,012.50 extra.

It is an example to show the calculation, not a reference wage for the sector.

## What changes every year, from 2026 to 2030

| Year | Maximum working hours | Double-time overtime | Triple-time overtime |
| --- | --- | --- | --- |
| 2026 | 48 h | 9 h | 4 h |
| 2027 | 46 h | 9 h | 4 h |
| 2028 | 44 h | 10 h | 4 h |
| 2029 | 42 h | 11 h | 4 h |
| 2030 | 40 h | 12 h | 4 h |

Decree published in the Official Gazette of the Federation on May 1, 2026, second and fourth transitory provisions, and article 68 of the LFT. Each change applies from January 1.

## Related terms

**[What is RESICO](https://sicheca.com/en/blog/que-es-resico).** RESICO is the Simplified Trust Regime (Régimen Simplificado de Confianza), a tax regime with reduced income tax rates for individuals and companies with income below certain limits.

**[Sunday premium: what it is and how it is calculated](https://sicheca.com/en/blog/prima-dominical).** The Sunday premium is an additional payment of at least 25% on the salary of an ordinary day for anyone who works on Sunday.

**[What the STPS is and what it does](https://sicheca.com/en/blog/que-es-la-stps).** The STPS is the Ministry of Labor and Social Welfare.

## Frequently asked questions

### Does a construction company need to buy a time clock?

No. The law requires an electronic record of working time, not a device. An app on a phone complies.

### What options are there for recording working time?

An app on each person's phone, a shared tablet or a clock connected to a system. All three comply if they generate an electronic record per person, with a start and an end time.

### Can I ask for more overtime in peak season?

The weekly cap is not extended for the season. It helps to plan relief staff.

### Does temporary staff also clock in?

Yes. Their record is kept even if they work only one day.

### What happens when the STPS publishes its rules?

They will specify who the record applies to and its exceptions. It is worth checking them as soon as they appear in the Official Gazette of the Federation.

## Legal basis and sources

- Electronic working-time record: article 132, section XXXIV, of the LFT and fifth transitory provision of the decree.
- Overtime: articles 66 and 68 of the LFT and fourth transitory provision of the decree.
- Working hours: articles 58 to 64 of the LFT and second transitory provision of the decree.
- [Decree amending the Federal Labor Law on the reduction of the working week](https://sidof.segob.gob.mx/notas/docFuente/5786537). Official Gazette of the Federation, May 1, 2026.
- [Federal Labor Law, current text](https://www.diputados.gob.mx/LeyesBiblio/pdf/LFT.pdf). Chamber of Deputies.

**How we write this content.** The Sicheca team writes it from the official text of the law. When something is not yet defined by the authority, we say so. It is general information and does not replace the advice of a lawyer or an accountant.

## Keep reading

[ By industry **Time clock for installation and maintenance companies: working-time record without devices**](https://sicheca.com/en/blog/reloj-checador-para-instaladores-y-mantenimiento) [ By industry **Attendance control for solar panel installers: how to comply with the law**](https://sicheca.com/en/blog/control-de-asistencia-para-instaladores-de-paneles-solares) [ By industry **Time clock for restaurants: working-time record without devices**](https://sicheca.com/en/blog/reloj-checador-para-restaurantes) [ Glossary **What the UMA is and how much it is worth**](https://sicheca.com/en/blog/que-es-la-uma-y-cuanto-vale)

[See all articles](https://sicheca.com/en/blog/)

Who publishes this blog

Sicheca is a digital time clock for recording working time from your phone. We write these guides from the official text of the law, so any business can understand what applies to it. If you want to try it, there is a waitlist.

[Join the waitlist](https://sicheca.com/en/lista-de-espera?utm_source=blog&utm_medium=articulo&utm_campaign=registro-de-jornada-para-constructoras&utm_content=final)
